Thursday, November 10, 2011

120 Design: Response to Feedback


Above Ground Circulation Space














If the design were to have an above ground circulation route the main connection would be to the third building as there is no need for a connection between buildings 1 and 2. The building forms as discussed earlier in the planning side create barriers passed the sites - so these connections would be from above ground feeding off the roof circulation already created by the roof forms.




No comments:

Post a Comment